WATER MANAGEMENT AND ENGINEERING

We are engaged in comprehensive construction activities in the field of gas pipelines, water supply, sewerage, wastewater treatment and public lighting. One of our advantages is the use of pneumatic overpressures of engineering networks.

IN THE FRAMEWORK OF THE SECTORS, WE SPECIALIZE IN:

Before the construction itself, we will give you professional advice, prepare a study and ensure communication with the distribution network operator. We will prepare detailed project documentation for the construction. We can also perform prescribed tests and inspections of pipelines.

We can ensure the construction and reconstruction of pumping and pressure stations, long-distance pipelines, water distribution networks or reservoirs. We solve water capture and accumulation, regulation of watercourses and construction of water works. As well as water treatment for drinking or industrial purposes. Among other things, we are able to provide operator training.

We provide construction of pressure and gravity sewers, sewer networks and sewage pumping stations. We also work with rainwater - construction of rain and irrigation reservoirs or flood pumping stations. We perform camera monitoring of pipelines and pressure tests of pipelines.

We are engaged in the construction of either small (houses) or large (municipalities, cities or camps) treatment plants and pumping stations, as well as water treatment plants from industry and livestock breeding. We will ensure the disposal of sludge. We will prepare studies of sewer networks for the needs of long-term prospects for the development of settlements, including economic evaluation.

OVERPRESSURE OF ENGINEERING NETWORKS

We will ensure the complete implementation of pneumatic overpressures. This method of implementation is used mainly in the construction of ground distribution and engineering networks, which cross the already built roads, e.g. roads, sidewalks or railway tracks. It is possible to push pipes up to a diameter of 200 mm with a maximum length of 30 m with ground rockets. This method minimizes damage to existing construction and downtime.

Send us an e-mail

info@erigom.sk